United Union Oil & Gas Inc.

Excellence With Quality At Its Best Since 1989
  • contact@unitedunionoilandgas.com

Call Us

+63-47-251-3911
+63-926-637-7103

Corporate Offices

One Global Place, BGC, Taguig
Boton, Subic Bay Freeport Zone
  • One Global Place, BGC, Taguig
  • Boton, Subic Bay Freeport Zone
  • +63-47-251-3911
  • +63-926-637-7103
uuog-logo

How does waste to Energy Work?

The process of generating electricity in a mass-burn waste-to-energy plant has seven stages

  1.  Waste is dumped from garbage trucks into a large pit.
  2. A giant claw on a crane grabs waste and dumps it in a combustion chamber.
  3. The waste (fuel) is burned, releasing heat.
  4. The heat turns water into steam in a boiler.
  5. The high-pressure steam turns the blades of a turbine generator to produce electricity.
  6. An air pollution control system removes pollutants from the combustion gas before it is released through a smoke stack.
  7. Ash is collected from the boiler and the air pollution control system.

Need Help with Easier Petrochemical Supply & Logistics?
We Are Experts!